威尼斯最新网址-金沙国际注册娱乐网址-首页

Hotline:13775442299
PVC plastic template

Contact

Jiangsu Wangke New materials Co., Ltd. 

Contact: Manager Wang. 

Mobile phone: 13141505998. 

Contact: manager Li. 

Mobile phone: 13775442299. 

Tel: 0518 81183228. 

Fax: 0518 81183328. 

E-mail: jswkxcl@163.com. 

Web site: www.jswkxcl.com. 

Add: no. 5 Donghai road, Haizhou development zone, Lianyungang city, Jiangsu province



How can the building template used in building construction save materials?

Your current location: Home >> News >> Technical knowledge

How can the building template used in building construction save materials?

Date of release:2019-04-22 Author: Click:

There is a material waste in the use of building template in many construction sites. 

You know, every few centimeters in such a big construction project. 

How much will it cost at a time. 

The following for you to introduce the construction of plastic building template Wangke how to achieve more material savings? 

When using steel pipe as support and crossbar, it is necessary to start as a whole, carefully plan and calculate, meet a certain engineering modulus when the steel pipe is long and short, and carry out construction according to the detailed structure height and scale of the building template project. 

According to the characteristics of the project, the top support rod is supplemented by 2.1m main 1.2m and 0.9m vertical rod, which can effectively improve the weekly material application power. 

According to the drawings carefully arrange the board, each beam as little as possible stitching. 

Do not ravage and impact the heavy objects on the placed wooden mold at will; the back of the wood should be classified and accumulated, and should not be cut off or sawed or cut at will.

Plastic building template

template removal fasteners shall not be littered, while removing into the bag. 

The remaining fasteners and nails of the device should be loaded into the special backpack to be recovered according to the requirements and should not be thrown at random. 

Remove the template according to the logo hanging to the template accumulation place, by the template maintenance personnel timely sorting, correction, brushing mold release agent, marked unclear template re-identification; do careful maintenance, in order to extend the use period. 

Remove the template to be constructed according to the operational requirements, prohibit fierce prying, raw smashing, and large area prying off, as far as possible do not damage the wood template , facilitate turnover, remove the removed template in time to eradicate the appearance of oil pollution. 

And carry on the refurbishment brush good release agent, so that it can be used again.


The address of this article:/en/news/413.html

Key word:ProductionofplasticBuildingtemplate,Priceofplasticbuildingtemplate,Plasticbuildingtemplatewholesale

Recently browse:

Crust foaming template

Scan the code and learn more

Contact

Jiangsu Wangke new materials Co.,Ltd

Tel:13141505998/13775442299

Email:jswkxcl@163.com

Web:www.jswkxcl.com

Add:No. 5 Donghai road, Haizhou development zone, Lianyungang city, Jiangsu province

威尼斯最新网址|金沙国际注册娱乐网址

XML 地图 | Sitemap 地图